Commissioning is the final technical stage of a solar installation. It confirms that the system has been installed correctly, electrical protection operates appropriately and the monitoring system is configured.
What is tested?
- Electrical connections
- Protective devices
- Isolation arrangements
- Inverter operation
- Solar generation
- Battery operation where installed
- Monitoring communications
- System configuration
Why is monitoring important?
Monitoring allows the homeowner to see energy generation and identify unusual changes in system performance. It also provides useful information when diagnosing future faults.
What should the homeowner receive?
- System documentation
- Equipment information
- Warranty details
- Monitoring access
- Relevant electrical certification
- Operating instructions
Do not treat commissioning as paperwork
Proper commissioning verifies that the installed system actually operates as designed.
Install solar with complete handover
Choose an installation process that includes testing, commissioning, monitoring and documentation.
Explore SolarFrequently asked questions
What is solar commissioning?
Commissioning is the process of testing and configuring the completed solar installation to confirm that it operates correctly.
Do solar panels need testing after installation?
Yes. The completed electrical installation should be appropriately tested and commissioned before handover.
What documents should I receive after solar installation?
The exact documents vary, but homeowners should receive relevant installation, electrical, warranty and monitoring information.