Many domestic solar installations may benefit from permitted development rights, but planning requirements depend on the property, installation design, location and applicable restrictions.
What are permitted development rights?
Permitted development rights can allow certain building works to proceed without a full planning application, provided specified conditions are met.
When can additional planning requirements apply?
- Listed buildings
- Conservation areas
- Properties in specially protected locations
- Unusual installation designs
- Ground-mounted systems
- Large commercial installations
What about commercial solar?
Commercial installations can involve different planning considerations depending on building type, system size, location and local authority requirements.
Planning should be checked before installation
Do not assume that every solar installation has identical planning requirements. The property and proposed system should be assessed individually.
Plan your solar project correctly
We can help identify planning and installation considerations before your solar system is designed.
Start Your Solar ProjectFrequently asked questions
Do solar panels need planning permission?
Many installations may fall within permitted development rights, but the requirements depend on the property, location and system design.
Do listed buildings need planning permission for solar?
Listed buildings can have additional planning and heritage requirements. The specific property should be checked before installation.
Do commercial solar panels need planning permission?
Requirements vary according to the building, location, installation size and design.
Robert Hayes
Planning and Compliance Consultant at BrightGrid Energy


