BrightGrid EnergyBrightGrid
Solar

Solar Panel Installation Process UK: What Happens From Survey to Handover?

Marcus Webb· 1 min read

Understanding the solar installation process makes it easier to compare installers and know what should happen after you request a quote. A professional project involves much more than putting panels on a roof.

1. Initial assessment

The process normally begins with information about the property, electricity consumption, roof, existing electrical system and future energy plans.

2. Roof and site survey

The installer assesses roof condition, dimensions, orientation, pitch, shading, access and potential panel locations.

3. System design

The design determines panel layout, inverter selection, cable routes, protection equipment, battery configuration and monitoring.

4. Grid and DNO requirements

Where required, the project follows the applicable grid-connection process. The requirements depend on the system and network connection.

5. Installation

Installation typically includes roof mounting, panels, cabling, inverter installation, electrical protection and optional battery or EV equipment.

6. Commissioning

The completed system is tested and configured. Monitoring systems are connected and the installer should explain how the system operates.

7. Handover

  • Electrical certification
  • System documentation
  • Product warranties
  • Monitoring access
  • Operating instructions
  • Relevant grid documentation
StageMain objective
AssessmentUnderstand property and energy requirements
SurveyConfirm physical installation conditions
DesignCreate the electrical and physical system
InstallationInstall equipment safely
CommissioningTest and configure the system
HandoverProvide documentation and customer training

A good installation starts before the first panel reaches the roof

The quality of the survey, system design and electrical planning has a major influence on the final installation.

Start your solar installation

Get a system designed around your property, electricity use and future energy requirements.

Explore Solar

Frequently asked questions

What happens during a solar installation?

A typical project includes assessment, survey, system design, applicable grid processes, installation, commissioning and handover.

How long does solar installation take?

The physical installation can often be completed relatively quickly, but the overall project timeline depends on design, equipment availability, grid requirements and property complexity.

Do solar installers provide certification?

A professional installation should include the relevant electrical and installation documentation.

Can batteries be installed at the same time?

Yes. Solar and battery systems can often be designed and installed together.

MW

Marcus Webb

Head of Engineering at BrightGrid Energy

Ready when you are

See what this means for your home.

Two minutes of questions, seven system options, modelled against your own numbers.

Check Your Savings